THE CREW ENDED THE WEEKS WORK TODAY AT PANAY AVE. THEY ENCOUNTERED THIER FIRST CONCRETE DRIVEWAY.
AS SEEN BELOW, PANAY AVE, AS ALL OTHER SIDE STREETS, ARE FED WITH A 2" PIPE, THE NEW PIPE WILL BE 6".
A 3/4" PIPE IS ATTACHED TO THE OLD PIPE TO FEED A WATER TEST STATION AT PANAY.
"DERECK MOORLEY" THE PROJECT MANAGER FOR DN HIGGINS WAS INSPECTING THE WORK TODAY.
THE CREW WILL ENCOUNTER THE FIRST OBSTACLE NEXT WEEK, WHEN THEY HAVE TO REMOVE 2 SETS OF HEDGES. THE FIRST IS THE END OF A HEDGE AND THE SECOND IS A ROW OF HEDGES.