"BRANDY", THE REGIONAL MANAGER WITH DN HIGGINS(the company that is installing the water pipe), ARRANGED THE REPLACEMENT CONCRETE FOR THE DRIVEWAY CUTS. HE IS ALSO ARRANGING THE REPLACEMENT SOD. EMPTY LOTS WILL BE SEEDED ONLY.
WHEN THE NEW WATER PIPE WAS PUT IN, THE CONCRETE DRIVEWAYS THAT HAD TO BE CUT WERE TEMPORALLY COVERED WITH DIRT..
THE CREW, DIRECTED BY "SOLOMON RAMOS", ARE NOW CUTTING THE DRIVES..
THEY ARE GRADED OUT AND COMPACTED..
THE EXPANSION JOINT INSTALLED, AND THE GRADE SET TO 6" DEEP..
POURED AND LEVELED..
THEN FINISHED OFF.
THE BORING COMPANY HAS FINISHED GRENADA AVE. AND IS WORKING ON LUZON AVE. THEY ARE BORING A 4" SLEEVE ACROSS THE STREETS TO EACH SET OF WATER METERS. THE NEW WATER PIPE WILL BE SLIPPED THROUGH THE SLEEVE.
CAPRI BLVD. WAS ONE LANE AS THE CREW DUG UP THE BASE COAT, CLEANED THE CUT AND COMPACTED THE LIME ROCK..
THE MAIN WATER LINE HAS ENDED FOR NOW AS THE CREW WILL GO BACK AND DO THE 5 SIDE STREETS. A WATER CANON IS TEMPORALLY INSTALLED TO ALLOW FLUSHING OF THE 12" MAIN BEFORE ANY HOME IS CONNECTED TO THE NEW SERVICE. GRENADA AVE WILL BE THE FIRST TO COME ON LINE.
WHEN THE UPPER SECTION IS COMPLETED, THE CREW WILL CONTINUE DOWN CAPRI BLVD TOWARDS THE FIRE DEPARTMENT.