NEW 6" GRENADA AVE ISOLATION VALVE
ARE INSTALLED.
THE EXISTING 2" FEED IS EXPOSED DURING THIS WORK. THE 2" PIPE IS TIED INTO THE OLD 6" WATER PIPE.
NEXT, THE 6" ISOLATION VALVE FOR THE FIRE
HYDRANT IS INSTALLED..
A 6" BLUE PVC SLEEVE IS VERTICALLY PLACED OVER EACH VALVE IN ORDER TO ALLOW A TOOL TO BE LOWERED DOWN AND OPEN OR CLOSE THE VALVE.
ON THE TOP OF THE BLUE PVC SLEEVE IS A BLACK METAL SLEEVE WITH A LID THAT IS PRINTED "WATER"
NEXT TO THE SLEEVE IS THE LOCATOR BALL, WHICH IS TALKED ABOUT IN A PREVIOUS BLOG.
THE SURVEY CREW LOCATES ALL OF THE VALVES TO AID IN CREATING AN AS BUILT PRINT.









No comments:
Post a Comment