THE DIGGING CREW CLEANED UP AREAS TO PREPARE THE GRASS TO BE LAID. A SAMPLING STATION IS INSTALLED AT THE CORNER OF PANAY AVE AND CAPRI BLVD..
A 12" SADDLE TAP IS BOLTED INTO PLACE..
A 1/2" HOLE IS DRILLED IN THE PVC WATER PIPE..
THEN THE SAMPLE BOX IS CONNECTED IN PLACE AND MOUNTED ON A CONCRETE POST..
THE FOLLOWING IS PART OF THE CREW OF DN HIGGINS THAT ARE INSTALLING OUR NEW WATER SYSTEM.










No comments:
Post a Comment