ISLES of CAPRI WATER SYSTEM

This blog will follow daily the progress of the installation of our new water pipes. The company will be working 4-10 hour days with friday open for surveying and cleaning up on the previous weeks work. The company and the county request that all people that are watching the progress to maintain a safe distance from working personal and equiptment. This blog hopefully will show you the progress daily in order to keep you as informed as possible.













My Blog List

Blog Archive

Wednesday, August 11, 2010

KONTIKI DR. - CRISTOBAL ST.

AT THE END OF KON TIKI DR. A FLUSHING CANNON IS INSTALLED. THIS WILL BE REPLACED WITH A FIRE HYDRANT AFTER THIS SECTION IS TESTED..






AT THE BLUE HERON A FIRE CONNECTION IS INSTALLED..




ON CRISTOBAL ST. THE CREW IS UNCOVERING THE PIPE THAT WAS BORED UNDER A DRIVEWAY. THIS PIPE WILL CONNECT TO THE NEW WATER PIPE ..



A SADDLE IS INSTALLED ON THE 6" NEW WATER PIPE TO SERVE THE HOME. AFTER THE SADDLE IS INSTALLED, THE PIPE IS TAPED..




A BLUE WATER PIPE IS INSTALLED TO MARK THE LOCATION OF THE TAP..





THE DITCH HAS EXCESS WATER AND HAS TO BE SCOOPED OUT..





THIS ALLOWS THE NEW WATER PIPE, WITH THE TAP INSTALLED, TO BE LAID IN THE DITCH AND CONNECTED.