THE DIGGING CREW UNCOVERS THE 6" NEW WATER PIPE..
THE PIPE IS TOTALLY EXPOSED AND CLEANED..
THE SADDLE TAP IS CLAMPED ONTO THE PIPE..
THE TAP IS DRILLED WITH THE SPECIAL DRILL THAT IS ABLE TO DRILL THE PIPE WITH PRESSURE ON THE PIPE..
THE SLEEVE UNDER THE ROAD IS OPENED FOR THE BLUE PIPE TO BE SLIPPED THROUGH..
THE BLUE WATER PIPE HAS FITTINGS INSTALLED TO READY IT FOR THE NEW SERVICE..
THE BLUE WATER PIPE IS SLIPPED THROUGH..
THE BLUE WATER PIPE IS CUT AND ATTACHED TO THE 6" NEW WATER PIPE..
THE DITCH IS FILLED AND THE CREW MOVES ON TO THE NEXT CONNECTION..
THIS IS ALSO CLEAN UP DAY, THE EXTRA DIRT IS REMOVED FROM THE LOT..