THE NEW WATER SERVICE CONNECTIONS TO RESIDENCES, CONTINUES ON PANAY AVE. THE 6" NEW WATER PIPE IS TAPPED USING A SADDLE TAP AND CONNECTING THE BLUE WATER PIPE..
THE DITCH FROM THE SADDLE TO THE WATER METER IS HAND DUG..
THE BLUE WATER PIPE IS SLIPPED THROUGH THE SLEEVE, THAT WAS BORED UNDER THE ROAD, AND CONNECTED TO THE 6" WATER PIPE..
A CAUTION TAPE IS LAID ON TOP OF BLUE PIPE BEFORE IT IS COVERED..
ALL OF THE NEW WATER PIPES ARE FLUSHED..
THE BLUE WATER PIPES ARE STAKED UP AT THE METER AND AWAIT THE WATER COMPANY TO BE HOOKED TO THE METER. THE DIGGING CREW CLEANS THE AREA AND MOVES ON TO THE NEXT WATER TAP.







No comments:
Post a Comment