THE STEEL PIPE IS WELDED TOGETHER..
BRACES ARE INSTALLED ACROSS THE COUPLINGS TO HOLD THE PIPE TOGETHER..
THE ROAD IS CUT TO PREPARE FOR TRENCHING..
THE 6" NEW WATER PIPE IS SLIPPED INTO THE STEEL PIPE AND RUBBER SLEEVES ARE STRAPPED ON THE ENDS, THEN THE ASSEMBLY IS LOWERED IN THE DITCH ACROSS CAPRI BLVD.

THE 6" SUB-MAIN IS BOLTED INTO THE ISOLATION VALVE..
GRAVEL IS THEN SPREAD AROUND THE STEEL PIPE..
THE EXCESS DIRT IS GATHERED AND CARRIED AWAY. FRESH ROAD BED DIRT IS TRUCKED IN TO COMPLETE THE FILL..
THE COUNTY INSPECTOR DRAWS A PICTURE SHOWING THE STEEL PIPE AND THE NEW WATER PIPE ON THE INSIDE OF IT..
THE DIGGING CREW TAKES A BREAK BEFORE CONTINUING DOWN KON TIKI ST.