This blog will follow daily the progress of the installation of our new water pipes. The company will be working 4-10 hour days with friday open for surveying and cleaning up on the previous weeks work. The company and the county request that all people that are watching the progress to maintain a safe distance from working personal and equiptment. This blog hopefully will show you the progress daily in order to keep you as informed as possible.













My Blog List

Blog Archive

Tuesday, September 7, 2010

SAMAR NEW WATER TAPS - PREPARE FOR NIGHT WORK

THE CREW THAT IS DOING THE NEW WATER CONNECTIONS ARE INSTALLING THE TAPS TO THE 6" NEW WATER PIPE. THESE TAPS WILL BE THE BLUE PIPE THAT WILL CONNECT TO THE NEW WATER METERS.


THESE FOUR TAPS WILL FEED 6 NEW WATER METERS, 2 ON EACH SIDE OF THE ROAD AND 2 ON  THE CUL-DE-SAC.


AND WHEN ALL IS DONE THE PIPES ARE FLUSHED OUT..



ANOTHER PART OF THE CREW IS INSTALLING CONCRETE CURBS AROUND ACCESS HOLES FOR THE ISOLATION VALVES..



AND THE NIGHT CREW IS GETTING THE PIPE READY TO BE CUT IN TONIGHT AT THE FIRE HOUSE.
THEY HAVE CONNECTED THE 6" VALVE AND ARE INSTALLING THE SADDLES ON EACH SIDE OF THE VALVE..





THE SPECIAL DRILL IS USED TO CUT THE TAP IN THE SADDLE..



THESE 2 TAPS WILL ALLOW THE FLUSHING OF THE WATER PIPE AFTER THE WORK IS COMPLETED..




THE INSTALLATION OF THIS VALVE WILL PERMIT THE DIGGING CREW TO HOOK UP THE TEMPORARY WATER PIPE ACROSS THE BRIDGE..


THE NIGHT LIGHTS ARE IN PLACE FOR THE WORK TONIGHT..



AFTER A 4 DAY HOLIDAY WEEKEND, WHERE EVER YOU LOOK, EVERY BODY AND EVERY THING HAS A  SMILE.