THE CREW IS DE-CHLORINATING THE NEW WATER SYSTEM TODAY, IN THE SECTION FROM NEAR ANTIGUA ST TO THE BRIDGE. THE NEW WATER PIPES HAVE BEEN SOAKING IN THE HIGH CHLORINE, TO CLEANSE THE INSIDE, SINCE FRIDAY.
THEY ADD A MIXTURE OF VITIMAN "C" TO THE WATER WHICH LOWERS THE CHLORINE FROM OVER 200PPM TO NEARLY 0.
THE DE-CHLORINATOR IS CONNECTED TO A SIPHENING MANAFOLD..
THE WATER IS MONITORED BOTH AT THE HYDRANT..
AND AT THE NOZZLE TO CONFIRM THE REDUCTION IN CHLORINE.




No comments:
Post a Comment