ISLES of CAPRI WATER SYSTEM

This blog will follow daily the progress of the installation of our new water pipes. The company will be working 4-10 hour days with friday open for surveying and cleaning up on the previous weeks work. The company and the county request that all people that are watching the progress to maintain a safe distance from working personal and equiptment. This blog hopefully will show you the progress daily in order to keep you as informed as possible.













My Blog List

Blog Archive

Wednesday, November 3, 2010

MILESTONE

THE FLUSHING CANNON THAT WAS STICKING UP IN THE AIR AT THE BRIDGE WAS DUG UP AND A FIRE HYDRANT WAS INSTALLED.


THIS FIRE HYDRANT IS THE SPOT WHERE PHASE TWO WILL BEGIN..


A SADDLE TAP IS INSTALLED ON THE 12" NEW WATER PIPE FOR THE RESIDENCE AT CAPRI MARINA


THE NEW WATER PIPE IS FLUSHED BEFORE BEING CONNECTED TO THE NEW WATER METER..


NEXT IS DRIFTWOOD LANDINGS..


THE ROYAL PALMS HAD THICK ROOTS..


THE 2" NEW WATER PIPE IS SLIPPED THROUGH THE 4" SLEEVE THAT IS UNDER THE ROAD..


THE DITCH IS COMPLETED BY HAND DIGGING..


THE SIDE WALK IS CUT..


THE 2" WATER PIPE IS FLUSHED..


AND THE NEW 2" METER IS INSTALLED..

EVERY THING IS PICKED UP AND MOVED TO THE LAST NEW WATER METER..


TARPON BAY MARINA IS THE LAST RESIDENTIAL OR COMMERCIAL WATER METER TO BE CONNECTED TO THE NEW WATER SYSTEM IN PHASE ONE..


A SADDLE TAP IS INSTALLED..


THE SADDLE IS DRILLED OUT WITH A SPECIAL DRILL THAT CUTS HOLES ON PRESSURIZED PIPE..


THE NEW 2" WATER PIPE IS CONNECTED TO THE SADDLE..


THE WATER PIPE IS FLUSHED..


AND CONNECTED TO THE WATER PIPE THAT FEEDS THE TARPON BAY MARINA..


THE CREW WAS WORKING SO HARD TODAY THAT "JIMMY", THE SUPERINTENDENT, USED A NEW WAY TO SAY "TIME TO GO HOME".



No comments: