THE FLUSHING CANNON THAT WAS STICKING UP IN THE AIR AT THE BRIDGE WAS DUG UP AND A FIRE HYDRANT WAS INSTALLED.
THIS FIRE HYDRANT IS THE SPOT WHERE PHASE TWO WILL BEGIN..
A SADDLE TAP IS INSTALLED ON THE 12" NEW WATER PIPE FOR THE RESIDENCE AT CAPRI MARINA
THE NEW WATER PIPE IS FLUSHED BEFORE BEING CONNECTED TO THE NEW WATER METER..
NEXT IS DRIFTWOOD LANDINGS..
THE ROYAL PALMS HAD THICK ROOTS..
THE 2" NEW WATER PIPE IS SLIPPED THROUGH THE 4" SLEEVE THAT IS UNDER THE ROAD..
THE DITCH IS COMPLETED BY HAND DIGGING..
THE SIDE WALK IS CUT..
THE 2" WATER PIPE IS FLUSHED..
AND THE NEW 2" METER IS INSTALLED..
EVERY THING IS PICKED UP AND MOVED TO THE LAST NEW WATER METER..
TARPON BAY MARINA IS THE LAST RESIDENTIAL OR COMMERCIAL WATER METER TO BE CONNECTED TO THE NEW WATER SYSTEM IN PHASE ONE..
A SADDLE TAP IS INSTALLED..
THE SADDLE IS DRILLED OUT WITH A SPECIAL DRILL THAT CUTS HOLES ON PRESSURIZED PIPE..
THE NEW 2" WATER PIPE IS CONNECTED TO THE SADDLE..
THE WATER PIPE IS FLUSHED..
AND CONNECTED TO THE WATER PIPE THAT FEEDS THE TARPON BAY MARINA..
THE CREW WAS WORKING SO HARD TODAY THAT "JIMMY", THE SUPERINTENDENT, USED A NEW WAY TO SAY "TIME TO GO HOME".



















No comments:
Post a Comment