ISLES of CAPRI WATER SYSTEM

This blog will follow daily the progress of the installation of our new water pipes. The company will be working 4-10 hour days with friday open for surveying and cleaning up on the previous weeks work. The company and the county request that all people that are watching the progress to maintain a safe distance from working personal and equiptment. This blog hopefully will show you the progress daily in order to keep you as informed as possible.













My Blog List

Blog Archive

Tuesday, November 2, 2010

NEW WATER CONNECTIONS

THE END IS NEAR, THE LAST FEW CONNECTIONS ARE BEING MADE TO THE NEW WATER SYSTEM.  THE OLD PIPING WILL THEN BE REMOVED, GRASS LAID, AND FINAL PAVING.
THE LAST HOMES ON CRISTOBAL ST ARE BEING HOOKED UP..

THE NEW WATER METERS ARE BEING ASSEMBLED..


AND THE DITCHES ARE BEING HAND DUG..


NEXT IS THE CAPRI CAFE..


THE DITCH IS HAND DUG FROM THE SIDEWALK TO THE NEW METER..


ON THE OTHER SIDE OF THE ROAD, THE 12" NEW WATER PIPE IS EXPOSED TO INSTALL THE SADDLE TAP ..


THE NEW 1 1/2" WATER PIPE IS SLIPPED THROUGH THE 4" SLEEVE UNDER THE ROAD..


THE 1 1/2" WATER PIPE IS INSTALLED IN THE NEW SADDLE TAP..


THEN THE PIPE IS FLUSHED..


AND CONNECTED TO THE NEW WATER METER..

.