THE END IS NEAR, THE LAST FEW CONNECTIONS ARE BEING MADE TO THE NEW WATER SYSTEM. THE OLD PIPING WILL THEN BE REMOVED, GRASS LAID, AND FINAL PAVING.
THE LAST HOMES ON CRISTOBAL ST ARE BEING HOOKED UP..
THE NEW WATER METERS ARE BEING ASSEMBLED..
AND THE DITCHES ARE BEING HAND DUG..
NEXT IS THE CAPRI CAFE..
THE DITCH IS HAND DUG FROM THE SIDEWALK TO THE NEW METER..
ON THE OTHER SIDE OF THE ROAD, THE 12" NEW WATER PIPE IS EXPOSED TO INSTALL THE SADDLE TAP ..
THE NEW 1 1/2" WATER PIPE IS SLIPPED THROUGH THE 4" SLEEVE UNDER THE ROAD..
THE 1 1/2" WATER PIPE IS INSTALLED IN THE NEW SADDLE TAP..
THEN THE PIPE IS FLUSHED..
AND CONNECTED TO THE NEW WATER METER..
.