FOR THE LAST 3 DAYS THE WATER SYSTEM HAS BEEN SUPER-CHLORINATED. THE SYSTEM IS NOW FLUSHED AND THE CHLORINE LEVELS BROUGHT DOWN TO PROPER LEVELS. THE HIGHLY CHLORINATED WATER HAS TO BE DELUDED IN ORDER TO FLUSH THE SYSTEM AND NOT DAMAGE THE GRASS AND PLANTS AROUND THE FIRE HYDRANTS. VITAMIN C IS USED TO ACCOMPLISH THIS.
A SYPHON NOZZLE IS ATTACHED TO THE FIRE HYDRANT..
A BUCKET IS ATTACHED TO THE NOZZLE WITH PLASTIC HOSES..
AND THE FLUSHING BEGINS.
EACH STREET IS FLUSHED USING THE FIRE HYDRANTS AT THE END OF EACH STREET.
THE NEW WATER PIPE CREW LINES UP AND BEGINS BURYING THE 12" MAIN LINE TOWARDS CRISTOBAL ST.
THEY DIG AND COVER AS THEY GO..
THE NEW WATER PIPE HAS TO GO BENEATH A 24" STREET DRAIN..
THEY CUT THE ASPHALT AND CONTINUE ACROSS THE SIDE STREET..












1 comment:
Fun pictures!
Post a Comment