TAILGATE PLANING WAS USED TO COME UP WITH AN IDEA OF HOW TO PLACE THE TEMPORARY WATER LINE ACROSS THE BRIDGE WITHOUT SHUTTING OFF THE WATER TO THE SOUTH END OF THE ISLAND.
THE IDEA WAS PLACED BEFORE THE CONSTRUCTION MEETING AND IS ACCEPTED AS A PREFERABLE PLAN TO PREVENT THE SHUTTING DOWN OF THE WATER SYSTEM..
THE DIGGING CREW HAS MOVED TO THE LOT NEXT TO THE BLUE HERON RESTAURANT, AS THE PLACE TO STORE EXTRA DIRT AND MATERIAL..

THE LOT ON GRANADA AVE IS BEING CLEANED UP AND RESTORED BACK TO ITS ORIGINAL CONDITION..






No comments:
Post a Comment