HOLLISTER UNDERGROUND IS INSTALLING THE NEW TELEPHONE LINE. THEY HAVE CIRCLED AROUND THE COMMERCIAL SECTION..
THE CREW HAS PULLED BACK THE GRASS TO DIG THE NEW LINE IN..
THEY CONTINUE ACROSS THE FRONT OF THE NEW FIDDLERS CREEK PARKING LOT..
AS THEY APPROACH THE CORNER BY THE BOAT STORAGE, THEY RUN INTO BURIED TANKS AND LINES THAT WERE NOT ON THE PRINT. AT THIS POINT THEY HAVE TO HAND DIG..
THEY FOUND ELECTRIC, WATER AND A 24" DRAIN PIPE..
THE CREW INSTALLING THE NEW WATER PIPE IS SETTING UP THE SUPER-CHLORINATER TO CLEAN THE NEW WATER PIPES AND PREPARE FOR THE HOOK UP TO THE HOMES. THE CHLORINE IS A GAS, THAT IS SET UP IN A SPECIAL TRAILER.

THE CHLORINE RIG IS PIPED INTO THE NEW WATER PIPES..
AT THE END OF EACH STREET THE SAMPLE POINT AND THE FIRE HYDRANT IS OPENED SLOWLY UNTIL THEY DETECT CHLORINE AT THAT POINT.
WHEN THE CHLORINE IS DETECTED AT ALL POINTS THE SYSTEM WILL BE CLOSED AND WILL SET FOR 3 DAYS. THIS WILL DISINFECT THE SYSTEM.