THE DIGGING CREW HAS TO INSTALL THREE COUPLING SUPPORT STRAPS BEFORE TYING THE 8" OLD WATER PIPE INTO THE TEMPORARY WATER PIPE THAT CROSSES THE BRIDGE. THE FIRST SUPPORT STRAP IS INSTALLED..
WHILE OPENING UP THE SECOND COUPLING, THE BELL END SPLIT OPEN AND THE 8" WATER HAD TO BE SHUT DOWN..
THE WATER HAD TO BE PUMPED OUT OF THE HOLE..
THE 8" WATER PIPE WAS CUT OPEN..
THE BELL WAS REMOVED..
AND THE FAULTY SECTION WAS REMOVED..
AND A NEW SPLICE PIECE IS INSTALLED AND BOLTED IN PLACE..