THE WEEKLY CONSTRUCTION MEETING WAS HELD TODAY AT 10:00AM AT THE FIRE HOUSE.
DISCUSSED WAS MORE ABOUT THE REMOVAL AND DISPOSAL OF THE AC WATER PIPE. THIS IS THE OLD 6" WATER PIPE THAT WAS ORIGINALLY INSTALLED IN THE LATE 1950'S. THIS REMOVAL WILL BE COMPLETED AFTER ALL OF THE WATER METERS ARE CONNECTED TO THE NEW WATER SYSTEM.
THE NEW WATER PIPE IS IN THE PROCESS OF BEING LAB TESTED. WHEN THIS IS COMPLETE, THE RESULTS WILL BE SENT TO THE STATE TO BE SIGNED OFF. THEN THE NEW METER CONNECTIONS WILL BEGIN.
IF YOU HAVE BEEN DISTURBED BY CONSTRUCTION NOISE AT NIGHT THIS WEEK, IT WAS TO GET EQUIPTMENT AND MATERIAL OUT OF THE YARD TO WORK ON TWO EMERGENCIES, THAT HAPPENED OFF OF THE ISLAND AT NIGHT. THIS IS REGRETTABLE, BUT VERY UNPREDICTABLE.