THE CREW MOVED TO THE NEXT AREA THAT THE ASBESTOS WATER PIPE NEEDS TO BE REMOVED..
THE LOCAL AIR MONITOR IS TAPED IN PLACE..
AND THE PERSONAL MONITOR IS PLACED ON ONE OF THE WORKERS THAT WILL BE IN THE DITCH..
THE ASBESTOS CONSULTANT, "ERIC GOELLER", MONITORS THE WORK..
A 12 FOOT PIECE OF 6" ASBESTOS PIPE IS PULLED FROM THE GROUND..
IN ABOUT 1956, WHEN DOC LOACH COULD NOT FIND A WELL ON THE ISLAND, HE BUILT THE WATER PUMP STATION AND WATER TANK AND LAID THIS 6" ASBESTOS WATER PIPE TO SERVE THE FOUR ISLANDS. TWICE A DAY HE HAD WATER TRUCKED IN FROM NAPLES TO KEEP THE WATER TANK FULL AND THE WATER PUMPS MAINTAINED THE PRESSURE.
THIS ORIGINAL WATER PIPE IS NOW BEING REMOVED AND A NEW 12" PVC WATER PIPE HAS REPLACED IT.
THIS ASBESTOS WATER PIPE IS COVERED IN PLASTIC..
AND PREPARED FOR PROPER, PERMANENT AND SAFE BURIAL..
THE REMAINING ASBESTOS PIPE THAT WILL NOT BE PULLED FROM THE GROUND, WILL BE PUMPED FULL OF GROUT AND MARKED ON A BLUE PRINT..
THE CREW MOVES TO THE NEXT SITE THAT NEEDS ASBESTOS REMOVAL..
WARNING SIGNS, BARRIER, AND AIR MONITORS ARE SET INTO PLACE..
AND THE DIGGING BEGINS..
IT IS THURSDAY, AND THE CONSTRUCTION PROGRESS MEETING IS HELD AT THE WORK SITE..
AS MORE OF THE ASBESTOS IS REMOVED..
AND WRAPPED UP FOR BURIAL.
THE MARKING ON THE BAG IDENTIFIES WHERE THIS PIECE WAS REMOVED FROM.