THE NEW WATER METER FOR THE ENTRANCE SIGN IS LOCATED NEAR THE DRIVE INTO THE WATER STATION..
THE 1 1/2" NEW BLUE WATER PIPE WAS BURIED FROM HERE TO THE OLD METER LOCATION AND CONNECTED TO THE PVC GOING TO THE SPRINKLERS..
THE DIGGING CREW STARTED AT CRISTOBAL ST, UNCOVERING THE OLD 8" PVC WATER PIPE..
THEY STRAP ONTO THE PIPE AND PULL IT OUT OF THE GROUND..
EACH PIPE IS 20' IN LENGTH..
THE PIPES ARE CARRIED TO THE STORAGE LOT AND PLACED IN DUMPSTERS..
AT ANTIGUA ST, THE OLD WATER PIPE IS UNDER THE NEW WATER PIPE AND IS CUT TO ALLOW IT TO BE PULLED OUT FROM UNDER THE NEW WATER PIPE..
"JERRY ZIMMERMAN", COUNTY FIELD INSPECTOR, PREVIEWS HIS PICTURES TO PREPARE FOR HIS WORK PROGRESS REPORTS..
THE WATER THAT COMES OUT OF THE 8" OLD WATER PIPE, HAS TO BE REMOVED TO ALLOW FOR THE WORKERS TO GET IN THE DITCH..
AMR
AUTOMATIC METER READING;
THE COUNTY PROGRAM THAT IS INVOLVED IN READING OUR WATER METERS.
THIS PROGRAM READS OUR METERS REMOTELY BY HAVING AN "ERT" DEVICE INSTALLED ON TOP OF THE WATER METER. WHEN THE VEHICLE HOUSING THE COMPUTER READER, DRIVES BY, IT ALERTS THE "ERT' AND A SIGNAL IS SENT THAT TELLS THE COMPUTER THE GALLONS USED, THE FLOW RATE OVER THE MONTH AND SHOWS AN ALERT IF A LEAK OR EXCESS USAGE IS POSSIBLE. THE VEHICLE TRAVELS AT 15 MPH OR LESS AND CAN READ THE "ERT"FROM A DISTANCE OF 500 FEET.
THE VEHICLE HAS RECEIVER ANTENNAS LOCATED ON THE TOP OF THE CAB..
SEVERAL COMPUTERS ARE SET UP TO RECEIVE THE DATA..
FELIPE'S CREW IS CONTINUING TO CLEAN UP AND PREPARE THE DRIVES FOR NEW ASPHALT..
"BASE COAT" IS LAID AND ROLLED IN TO ALLOW FOR THE NEW ASPHALT..













No comments:
Post a Comment