NOW THAT ALL OF THE RESIDENTIAL AND COMMERCIAL WATER METERS ARE INSTALLED IN THE FIRST PHASE OF WORK, THE CREW IS DOING THE FINISHING TOUCHES. THE FIRE SUPPRESSION SYSTEM FOR THE TARPON BAY MARINA IS BEING RECONNECTED..
THE DIRT IS PULLED BACK TO EXPOSE THE OLD 8" WATER PIPE AND THE NEW 6" ISOLATION VALVE FOR THE FIRE SUPPRESSION SYSTEM..
THE OPEN HOLE IS TAPED OFF FOR SAFETY PURPOSES..
AND EVERY ONE TAKES THEIR POSITIONS..
THE OLD TAP IS CUT OUT OF THE 8" OLD WATER PIPE. THE 8" WATER PIPE HAS BEEN TAKEN OUT OF SERVICE, SINCE ALL OF THE WATER METERS ARE INSTALLED..
THE TAP IS REMOVED FROM THE DITCH AND TAKEN AWAY..
THE NEW WATER PIPE 6" ISOLATION VALVE IS CONNECTED TO THE FIRE SUPPRESSION PIPE GOING TO TARPON BAY MARINA..
AT COMPLETION, THE PIPE IS FLUSHED AND READY FOR SERVICE..
TODAY WAS THE CONSTRUCTION MEETING. THE PROJECT MANAGER "DIANA DUERI", WAS NOT PRESENT DUE TO AN ILLNESS. SENIOR FIELD INSPECTOR "FRED SEXTON WAS THE MODERATOR. DISCUSSED WERE THE PLANS FOR COMPLETION:
THE ENTRY SIGN WATER METER NEEDED TO BE MOVED.
A FIRE HYDRANT ON CRISTOBAL ST NEEDED TO BE MOVED.
THE EXISTING WATER PUMPS AT THE WATER STATION WILL BE TAPPED INTO THE NEW WATER SYSTEM AND PUT ON LINE.
THE REMOVAL OF THE OLD WATER PIPES (6" AND 8"). THE REMOVAL WILL BEGIN AT THE FIRE HOUSE AND WORK NORTH.
THE REPAVING OF ALL ROADS IN PHASE ONE.