THE CONSTRUCTION MEETING IS AT THE CHURCH TODAY BECAUSE OF TRAINING AT THE FIRE DEPARTMENT. IT WILL BE BACK AT THE FIRE HOUSE NEXT WEEK..
DISCUSSED WAS THE RE-PAVING SCHEDULE THAT WILL HAPPEN TO ALL OF PHASE ONE AT THE COMPLETION OF THE WORK. ALSO DISCUSSED WAS THE ANNUAL FLUSHING OF OUR WATER SYSTEM THAT IS PRESENTLY UNDERWAY. DURING THIS PROCESS THE TASTE OR SMELL MIGHT CHANGE BUT THE QUALITY WILL REMAIN THE SAME..

THE INSTALLATION OF THE AIR RELEASE VALVES CONTINUES..
THE SADDLE TAP MUST COME DIRECTLY OUT OF THE TOP OF THE PIPE TO ALLOW AIR TO ENTER..
A SHUT OFF VALVE IS INSTALLED..
THE SPECIAL DRILL IS USED TO CUT THE WATER PIPE..
BRASS NIPPLES ARE THREADED IN..
45 DEGREE ELBOWS ARE USED TO ALLOW THE AIR TO RISE TO THE AUTOMATIC VALVE..
THE UNIT IS SET IN GRAVEL AND LEVELED.